Question 1.1. (TCO 1) In the systems development life cycle, the
goal of the design activity is to _____. (Points : 5)
determine exactly what a new or
modified information system should do
create a set of detailed plans
or blueprints for the system
build the application
ensure that the application
works as desired
Question 2.2. (TCO 2) To plan the code for a procedure, _____ uses
standardized symbols to show the steps the procedure must follow to reach its goal.
(Points : 5)
pseudocode
a TOE chart
a class diagram
a flowchart
Question 3.3. (TCO 3) Computer memory locations where programmers
can temporarily store and change data while an application is running are
_____. (Points : 5)
classes
literals
constants
variables
Question 4.4. (TCO 3) In Visual Basic, which of the following
correctly declares a named constant with the name strCOURSE that contains the
string value “BIS311”? (Points : 5)
Const strCOURSE As String =
“BIS311”
String Constant strCOURSE =
“BIS311”
Dim strCOURSE As “BIS311”
Const String “BIS311” As
strCOURSE
Question 5.5. (TCO 5) A _____ structure is used in an application
when a decision needs to be made, followed by an action derived from that
decision. (Points : 5)
selection
sequence
repetition
interrogative
Question 6.6. (TCO 5) If intQty contains 60, what will be the value
of intPrice after executing the following code?
Select Case intQty
Case 1 To 50
intPrice = 10
Case 51 To 100
intPrice = 8
Case > 100
intPrice = 6
Case Else
intPrice
= 0
End Select (Points : 5)
10
8
6
0
Question 7.7. (TCO 6) The loop below is classified as a(n) _____
loop.
Dim intNum As Integer = 2
Do
MsgBox( intNum.ToString() )
intNum *= intNum
Loop While intNum < 1000 (Points : 5)
infinite
pretest
posttest
counter-controlled
Question 8.8. (TCO 6) Which element of the following array contains
the value “Red”?
Dim strColors() As String = {“Red”, “Green”, “Blue”, “Yellow”}
(Points : 5)
strColors(4)
strColors(3)
strColors(1)
strColors(0)
Question 9.9. (TCO 7) The _____ of an independent Sub procedure
usually begins with the Private keyword. (Points : 5)
Call statement
argument list
procedure footer
procedure header
Question 10.10. (TCO 7) In the following function, what should go in
the blank in the function header?
Private Function GetRatio(dblNumerator As Double, dblDenominator As
Double) _____
Dim dblRatio As Double
dblRatio = dblNumerator/dblDenominator
Return dblRatio
End Function (Points : 5)
ByVal
ByRef
As Integer
As Double
Question 11.11. (TCO 2) An application for a shipping company needs
to keep track of the length, width, height, and weight of packages. Using
object-oriented programming methods, in this application, the weight of a
package would be represented by a(n) _____. (Points : 5)
object
attribute
method
class
Question 12.12. (TCO 4) (TCO 4) Consider the following class
definition:
Public Class Box
Public Length As Double
Public Width As Double
Public Height As Double
Public Function GetVolume() As Double
Return Length * Width * Height
End Function
End Class
If crate is an instance of Box, which of the following statements
assigns a value to a property? (Points : 5)
crate.Length = 42
dblVolume = crate.GetVolume()
crate.GetVolume(42)
Call crate.Length(42)
Question 13.13. (TCO 8) A programmer makes a connection between a
Visual Basic application and a database using the _____. (Points : 5)
Database Integration tool
data box control
Data Source Configuration
Wizard
Dataset Designer
Question 14.14. (TCO 9) The components of a two-tier architecture
are _____. (Points : 5)
the primary and the secondary
the client and the server
the master and the subordinate
the alpha and the beta
Page 2
Question 1. 1. (TCOs 1, 2, and 3) You have been asked to develop an
application with the following business requirements: The user will enter an
original price. When the user clicks a Calculate Sale Price button, the
application will calculate a sale price by multiplying the original price by
80%. The application will display the sale price to the user.
(a) Develop a TOE chart for this application. You do not need to put
it in table form, but list what would go in the Task column, what would go in
the Object column, and what would go in the Event column for each row of the
chart. Your chart should have at least three rows: one for input, one for
processing, and one for output.
(b) Write pseudocode for the button-click event procedure in this
application.
(c) Identify two variables and one constant that you would declare
for this application. For each, provide a variable or constant name that
follows the syntax rules of Visual Basic and the Hungarian naming convention,
and an appropriate Visual Basic data type. (Points : 30)
Spellchecker
Question 2. 2. (TCO 5) Consider the following Visual Basic code
snippet:
If intScore >= 100 Then
lblMessage.Text = “Great job!”
Else
lblMessage.Text
= “Better luck next time”
End If
(a) What type of control structure is this? Be as specific as
possible, and justify your answer.
(b) Describe step by step how this code will be executed and what
will be displayed to the user for each of the following values of
intScore: 99, 100, and 101.
(c) Rewrite this code snippet so that it still produces the same
results, but changing the condition in the first line from intScore >= 100
to intScore < 100. (Points : 30)
Spellchecker
(a) What type of control structure is this? Be as specific as possible, and
justify your answer.
The control structure is an if statement that returns a message based on the
value of the variable intScore.
(b) Describe step by step how this code will be executed and what will be
displayed to the user for each of the following values of intScore: 99, 100,
and 101.
For 99, the message displayed on the screen will be “Better luck next time”
because 99 is less than 100.
For 100, the message will be “Great job” as the value is included in the
scoop on the variable intScore. i.e. 100 =100 evaluates to true.
For 101, the message will be “Great job” as the value is included in the
scoop on the variable intScore. i.e 101 >100 evaluates to true.
(c) Rewrite this code snippet so that it still produces the same results,
but changing the condition in the first line from intScore >= 100 to
intScore < 100. (Points : 30)
Question 3. 3. (TCO 6) Consider the following code snippet:
Dim intTotal As Integer = 0
For intNum As Integer = 1 To 5
intTotal += intNum
Next intNum
MessageBox.Show( intTotal.ToString() )
(a) What type of control structure is this? Be as specific as
possible, and explain your answer.
(b) Identify the counter variable and the accumulator variable in
this loop. Explain your answer.
(c) Describe step by step how this code will be executed and what
value will be displayed in a message box to the user. (Points : 30)
Spellchecker
(a) What type of control structure is this? Be as specific as possible, and
explain your answer.
The control structure is a “for” loop that controls the execution of the
condition and incrementing the intNum variable by 1, until the value 5 is
reached.
(b) Identify the counter variable and the accumulator variable in this loop.
Explain your answer.
The counter variable is intNum as it is increased by one within the loop and
used to control the loop while the accumulator variable is intTotal because it
stores the incremented value.
(c) Describe step by step how this code will be executed and what value will
be displayed in a message box to the user. (Points: 30)
The variable intTotal is initialised to 0, then the counter variable
(intNum) is increased by one at each step until it obtains a value 5, then the
loop stops. The message displayed on the screen will be: 0 1 2 3 4 5.
Question 1. 1. (TCO 7) (a) Explain the difference between passing by
value and passing by reference when passing variables to a Sub procedure or
function.
(b) Describe a specific example of using a Sub procedure when you
would pass a variable by value.
(c) Describe a specific example of using a Sub procedure when you
would pass a variable by reference. (Points : 30)
Spellchecker
(a) Explain the difference
between passing by value and passing by reference when passing variables to a
Sub procedure or function.
Passing by value refers to a method of referencing variables by initialising
them to real values while passing by reference is a reference method that
involves assigning values to functions through other variables.
(b) Describe a specific example of using a Sub procedure when you would pass
a variable by value.
Function sum {
Result=12 ;}
(c) Describe a specific example of using a Sub procedure when you would pass
a variable by reference. (Points : 30)
Function sum {
a=10, b=12;
Sum=a+b ;}
Question 2. 2. (TCOs 2 and 4) You have been asked to develop an
application to keep track of employees’ scheduled vacations and ensure that all
vacations are approved by the manager and that each employee does not exceed
his or her maximum annual vacation time. Maximum annual vacation time is
determined by the number of years the employee has worked for the firm. You are
using object-oriented programming (OOP) to develop this application.
(a) Describe at least two classes that you could use in this
application and what each class would represent in the real world.
(b) Describe at least two properties of each class you identified in
part (a) and identify the data type you would use for each property.
(c) Describe at least one method of each class you identified in
part (a), giving for each the method name and the action performed by the
method. (Points : 30)
Spellchecker
(a) Describe at least two classes that you could use in this application and
what each class would represent in the real world.
(b) Describe at least two properties of each class you identified in part
(a) and identify the data type you would use for each property.
(c) Describe at least one method of each class you identified in part (a),
giving for each the method name and the action performed by the method. (Points
: 30)
Question 3. 3. (TCOs 8, 9, and 10) (a) Explain the roles of primary
and foreign keys in a relational database.
(b) In a two-tier architecture with a thin client and fat server,
describe the functions performed by the client and by the server in processing
a request by a user for information from a database.
(c) In a Visual Basic application that retrieves data from a
database, describe the role of a TableAdapter object. (Points : 30)
Spellchecker
(a) Explain the roles of primary and foreign keys in a relational database.
(b) In a two-tier architecture with a thin client and fat server, describe
the functions performed by the client and by the server in processing a request
by a user for information from a database.
.
(c) In a Visual Basic application that retrieves data from a database,
describe the role of a TableAdapter object. (Points : 30)